| Evaluation Report of Swordfish Iron Oxide Cutting Electrode | |||
| This evaluation of our Swordfish Cutting Electrode was conducted by Shell and published in April 2004. The report has been split into two sections for downloading. You should be aware that section 1 which contains the Evaluation Report is just over 1mb and that Section 2 which contains the Swordfish User Manual is just over 2mb. These will take some time to download over slower connections. | |||
| Contents | Page No. | ||
| Section 1 Document Control and Administration | 4 |
||
| 1.1 Document Revision Information | 4 |
||
| 1.2 References | 4 |
||
| 1.2.1 Internal References: | 4 |
||
| 1.2.2 External References: | 4 |
||
| Section 2 Project Background | 5 |
||
| 2.1 Introduction | 5 |
||
| 2.2 Objective | 5 |
||
| 2.3 Overview | 5 |
||
| Section 3 Management Plan | 6 |
||
| 3.1 Plan the Project | 6 |
||
| 3.1.1 Project Safety | 6 |
||
| 3.1.2 Risk Assessment | 7 |
||
| 3.1.3 Technical Specifications and Calculations | 12 |
||
| 3.1.4 Training Needs Analysis | 13 |
||
| 3.2 Implement the Project | 14 |
||
| 3.2.1 Phase 1 – Project Scoping and Planning | 14 |
||
| 3.2.2 Phase 2 – Surface Evaluation and Identification of Training Requirements | 16 |
||
| 3.2.3 Phase 3 – In Water Evaluation 0 – 10M | 21 |
||
| 3.2.4 Project Engineer Summary | 22 |
||
| 3.2.5 Phase 4 – Quality Control – Collation and Summary of Feedback/Reports | 22 |
||
| 3.3 Conclusions | 27 |
||
| 3.3.1 Swordfish Specific Conclusions | 27 |
||
| 3.3.2 General Underwater Cutting Conclusions | 27 |
||
| Annex A: Cause and Effects of Underwater Explosions Report | 29 |
||
| List of Illustrations | 32 |
||
| Executive Summary | 33 |
||
| 1 Technical Discussion | 34 |
||
| 2 Powergen Gas Analysis | 45 |
||
| 3 Methane as an Explosive Hazard | 46 |
||
| 4 Conclusions | 48 |
||
| 5 References | 49 |
||
| Annex B: Materials Health, Safety Environmental Data Sheet | 50 |
||
| Annex C: Gas Analysis Results | 52 |
||
| Annex D: Supervisor’s Check List | 56 |
||
| Annex E: Swordfish™ Non Exothermic Cutting Electrode User Manual | 57 |
||
| Chapter 1 Introduction | 61 |
||
| Chapter 2 General Description | 62 |
||
| Chapter 3 System Operation | 65 |
||
| Chapter 4 Maintenance | 90 |
||
| Chapter 5 Troubleshooting | 91 |
||
| Chapter 6 Limited Warranty | 92 |
||
| Chapter 7 Quality Control | 93 |
||
| Download Section 1 (Swordfish Evaluation Report) | |||
| Download Section 2 (Swordfish User Manual) | |||
| Back to the top | |||